Project Risk Index™ · Risk Assessment

Quantify risk.
Not guess at it.

For GCs · Owners · Developers · Sureties

The Project Risk Index™ is a metric-driven risk assessment for construction projects. 16 categories, 291 scored inputs, weighted composite scoring, lifecycle decay modeling, and dollar-denominated contingency exposure — delivered as an interactive report your team can act on.

Pre-Bid Assessment — go/no-go risk profile FROM $2,500
Preconstruction Assessment — GMP validation FROM $7,500
Lifecycle Tracking — quarterly reassessment FROM $15,000
Enterprise — multi-project, annual retainer CUSTOM
See the sample report ↓
Project Risk Index™ Sample assessment
Schedule Risk
72
Procurement
64
Drawing Completeness
58
Contract Terms
47
Labor Risk
41
Safety Risk
33
Geotechnical
22
Environmental
14
$1.2B+
Project value assessed
47
Assessments delivered
$38M
Modeled exposure surfaced
18–24%
Avg. contingency variance vs. estimate
16
Risk Categories
Weighted and scored independently across all project dimensions
291
Binary Inputs
Yes / No / Unknown / N/A — no subjective 1–5 scales
5
Decay Models
Time-decay curves borrowed from options pricing theory
$
Dollar Exposure
Scores convert to contingency-dollar estimates per category
§01

Risk as a number,
not a conversation.

Traditional risk assessments produce qualitative matrices — red/yellow/green boxes that mean different things to different people. The Project Risk Index™ replaces that with a scored, weighted, repeatable methodology that produces a single composite number backed by 291 individual data points.

The assessment combines AI-powered document analysis with human expert judgment. Every input is tagged with its source — Claude analysis, human review, or hybrid — so you know exactly where each score came from and how confident the assessment is.

The result is an interactive HTML report with lifecycle tracking, decay-adjusted scoring, concentration analysis, and dollar-denominated exposure estimates. One number your team can track from pursuit through closeout.

Quantifiable Every category scored 0–100 from structured binary inputs. No subjective 1–5 scales, no "high/medium/low" judgment calls.
Repeatable Same methodology, same questions, same weights across every assessment. Results are comparable across projects and over time.
Lifecycle Risk scores decay over time using five mathematical models. A score of 60 at pre-bid means something different than 60 at 80% complete.
Dollar-Based Scores convert to modeled contingency-dollar exposure. "$2.1M in modeled risk" is more actionable than "high risk."
Dual-Source AI document analysis handles contracts, specs, and regulatory docs. Human experts handle drawings, field conditions, and market intelligence.
Transparent Every input tagged with its source. Every score traceable to specific questions. Full methodology disclosed in every report.
Dimension Traditional risk matrix Project Risk Index™
Scoring Subjective High / Medium / Low, calibrated to whoever holds the pen. 291 binary inputs producing mathematically derived scores 0–100.
Repeatability Two reviewers of the same project rarely produce comparable matrices. Same questions, same weights, same math. Results comparable across reviewers.
Portfolio comparability Every project uses its own matrix. Cross-project comparison is guesswork. One methodology. Composite scores are directly comparable across your portfolio.
Time dimension Static snapshot. Same red box at pre-bid and 80% complete. Five decay curves model how each risk resolves as the project progresses.
Dollar exposure Colors don't convert to contingency dollars. Each category converts to modeled contingency-dollar exposure.
Source transparency Judgment call by reviewer. Auditability depends on notes. Every input tagged Claude / Human / Hybrid with cited reasoning.
§02

Every dimension of project risk.

Each category is independently weighted, scored, and assigned a time-decay model based on when and how that type of risk resolves over a project's lifecycle. Grouped into five domains by where the risk originates.

Design & Documentation 3 categories · front-loaded resolution
01 Drawing Completeness Design detail adequacy, coordination completeness, drawing set maturity across all trades.
1.4× weightHumanFront-loaded
02 Specification Completeness Spec gap analysis, conflict identification, product substitution allowances, performance criteria.
1.2× weightClaudeFront-loaded
16 Design Team Risk Experience with project type, responsiveness, team cohesion, capacity, coordination history.
0.9× weightHumanFront-loaded
Commercial & Contract 3 categories · persistent through closeout
04 Contract Terms Indemnification, liquidated damages, change order procedures, dispute resolution, insurance requirements.
1.3× weightClaudePersistent
15 Financial / Bonding Funding stability, bonding capacity, cash flow exposure, contingency adequacy, surety relationships.
1.1× weightHybridPersistent
13 Owner / Client Risk Payment history, decision speed, change order tendencies, litigation history, organizational stability.
1.0× weightHumanPersistent
Site & Environment 3 categories · cliff resolution at excavation
14 Geotechnical / Site Subsurface conditions, water table, contamination, site access, existing utilities, bearing capacity.
1.0× weightClaudeCliff
10 Permitting Risk Permit timeline, approval complexity, variance requirements, inspection scheduling, agency backlogs.
1.1× weightHybridFront-loaded
07 Environmental Risk Contamination, endangered species, wetlands, stormwater, ESA findings, remediation requirements.
0.8× weightClaudeCliff
Delivery & Operations 4 categories · highest weighting, S-curve resolution
05 Safety Risk Hazard exposure, safety program adequacy, incident history, high-risk operations, OSHA compliance.
1.6× weightHybridS-curve
03 Schedule Risk Duration feasibility, float adequacy, milestone achievability, phasing complexity, weather exposure.
1.5× weightHybridS-curve
12 Labor Risk Trade availability, prevailing wage, union/open shop, workforce quality, overtime exposure, productivity.
1.3× weightHumanLinear
11 Procurement Risk Long-lead items, sole-source dependencies, tariff exposure, material availability, supply chain health.
1.2× weightHybridCliff
External & Market 3 categories · persistent, context-dependent
06 Regulatory Risk Code complexity, jurisdictional requirements, inspection protocols, compliance burden, AHJ relationships.
1.3× weightClaudePersistent
08 Public / Community Neighbor opposition, noise/traffic impact, community sentiment, public hearings, media exposure.
0.7× weightHumanLinear
09 Political Risk Funding stability, political support, election cycles, policy changes, public agency dynamics.
0.5× weightHumanPersistent
Ready to see where your project stands? A single assessment is the fastest way to know.
Request assessment →
§03

How the score is built.

Every assessment follows the same algorithmic framework — binary inputs, weighted composites, time-decay adjustments, and concentration analysis.

Scoring pipeline — from raw inputs to dollar exposure
01 · INPUTS
291
Binary questions
Yes = 0 · No = 1 · Unknown = 0.75 · N/A excluded
02 · CATEGORIES
16
Category scores
Normalized 0–100 per category · Low / Mod / High / Critical
03 · WEIGHT
0.5–1.6×
Weighted composite
Safety 1.6× · Schedule 1.5× · Political 0.5×
04 · DECAY
5
Time-decay models
Cliff · Front-loaded · S-curve · Linear · Persistent
05 · EXPOSURE
$
Dollar exposure
Score × cost-sensitivity factor ($0.5–7.0K per risk point)
Cliff Procurement, Geotech, Environmental — stays high until a specific event resolves it, then drops sharply.
Front-loaded Drawings, Specs, Permitting, Design Team — resolves quickly early as documents mature.
S-curve Schedule, Safety — slow at first, accelerates through construction, tails off.
Linear Labor, Public / Community — steady, proportional to time remaining.
Persistent Contract, Owner, Financial, Regulatory, Political — never fully decays.
01 Binary Inputs 291 yes/no questions across 16 categories. "Yes" = risk mitigated (0 points). "No" = risk present (1 point). "Unknown" = 0.75 points — uncertainty is almost as dangerous as a confirmed negative. "N/A" is excluded from the denominator.
02 Weighted Composite Each category carries a weight (0.5× to 1.6×) reflecting its importance to project outcomes. The composite score is the weighted average across all 16 categories, mapped to risk bands: Low (0–25), Moderate (26–50), High (51–75), Critical (76–100).
03 Time Decay Borrowed from options pricing theory. Five decay curves — cliff, front-loaded, S-curve, linear, and persistent — model how each risk type resolves as the project progresses. A score of 60 at pre-bid is very different from 60 at 80% complete.
04 Concentration Risk The Herfindahl-Hirschman Index measures whether risk is concentrated in a few categories or broadly distributed. A project with risk spread across many areas is fundamentally different from one where two categories dominate — even at the same composite score.
05 Correlation Analysis 15 directional relationships between categories model how risks compound. Drawing incompleteness drives procurement risk, which drives schedule risk, which drives labor risk. When source categories score high, correlated targets are flagged.
06 Dollar Exposure Each category has a cost-sensitivity factor ($0.5K to $7.0K per risk point). Scores convert to contingency-dollar estimates: "$2.5M in modeled exposure" is more actionable than "high risk." Modeled exposure is a planning input, not a reserve requirement.
§04

Risk shifts with the project.

The composite score doesn't stay flat — it decays as project uncertainty resolves. Below: how a sample $42.8M distribution center's composite tracks across the lifecycle. The PRI can be delivered at any phase.

Sample lifecycle · Crossroads Commerce Distribution Center Composite score decay · 71 → 22 across 16 months
100 75 50 25 CRITICAL HIGH MOD 71 PRE-BID 40.5 PRECON 34 CONSTRUCTION 22 CLOSEOUT
01 Pre-Bid / Pursuit Should you chase this project? Owner risk, market conditions, contract terms, scope definition, schedule feasibility. A quantitative go/no-go decision tool. Go / no-go decision
02 Bid / Preconstruction What are you pricing into? Drawing completeness, specification gaps, constructability, procurement lead times, labor planning. GMP validation and risk pricing. GMP validation
03 Construction Where are you exposed right now? Periodic reassessment of emerging risks, schedule performance, labor issues, change order velocity. Active risk management. Active risk management
04 Closeout What's going to drag? Punch list complexity, commissioning, warranty obligations, retainage release, lien waivers. Closeout risk management. Closeout risk management
§05

The deliverable.

An interactive HTML report with lifecycle assessment tracking, dynamic rendering, clickable category detail, decay analysis charts, and a full action plan. Below: a sample four-assessment lifecycle report for a $42.8M distribution center project.

§ A Composite score & exposure Headline number, decay-adjusted score, dollar exposure, HHI concentration.
§ B Top drivers & category bars Ranked drivers with per-category exposure, confidence, and item count.
§ C Findings & decay charts Findings tagged Human / Claude, each with dollar contribution and decay curves.
§ D Action plan Ordered by timing — owner, due date, resolved items retained for audit.
PRI Report · Crossroads Commerce Distribution Center View one-pager PDF Open full report →
Every report we deliver looks like the one above. Yours could be next.
Start an assessment →
§06

Assessment pricing.

Flat fee by project value. Lifecycle bundles save 15–20%. Enterprise retainers for repeat clients doing 10+ projects per year.

Two pricing dimensions: the range below is per assessment, indexed to project value. Each assessment phase (Pre-Bid, Preconstruction, Construction, Closeout) can be commissioned independently — or bundled as full lifecycle tracking at a 15–20% discount to the sum of phases.
Under $5M $2.5–5K Single assessment for smaller commercial, tenant fit-out, or residential projects. Full 16-category scoring with interactive report. Per assessment
$5M – $25M $7.5–15K Mid-market commercial, institutional, and industrial projects. Full assessment with document analysis and expert review. Per assessment
$25M – $100M $15–35K Large commercial, healthcare, higher-ed, and mixed-use. Comprehensive assessment with lifecycle tracking recommended. Per assessment
$100M+ $35K+ Major programs, campus-scale, and portfolio assessments. Custom scope with multi-tier delivery and enterprise retainer options. Custom scope
§07

Questions about risk assessment.

Traditional risk matrices use subjective high/medium/low ratings. The PRI uses 291 binary inputs that produce mathematically derived, repeatable scores — and every score converts to a dollar exposure, not just a color on a chart.
Whatever exists at your project's current phase: contract or draft, design documents, geotech and environmental reports if available. Claude analyzes contracts, specs, and technical reports; human experts assess drawings, labor, and field conditions. More documents = fewer “Unknown” responses.
~38% of the 291 questions are answered by Claude via structured document analysis with cited reasoning. Another 24% are hybrid (Claude drafts, human validates). The remaining 38% require expert judgment on drawings, market, and relationships.
5–10 business days for a first assessment; 3–5 days for lifecycle reassessments once the baseline is in place.
Borrowed from options pricing: not all risks decay at the same rate. Cliff (procurement, geotech), front-loaded (drawings), and persistent (contract, owner) risks all follow different curves. The model adjusts scores based on how much runway remains for each risk to materialize.
It's designed to complement, not replace. The PRI is the quantitative baseline; your qualitative discussions, relationships, and institutional knowledge layer on top.
§08

Let's assess your risk.

Tell us about your project and we'll scope a risk assessment — single pre-bid review, preconstruction deep-dive, or full lifecycle tracking.

02
Response
Within 1 business day
03
Deliverable
Interactive HTML report · PDF companion
Risk assessment inquiry Reply within 24 hrs
Drag & drop or browse PDF · XLSX · DOCX · max 25 MB per file · 5 files max

We respond within 1 business day. Information never shared.