Schedules built for
the field, not the wall.
Every activity carries predecessor logic, documented durations, and resource assignments. We build schedules that survive first contact with the field — baseline through closeout, with monthly updates and delay analysis when things shift.
The Critical Path Method is how real schedules get built.
CPM is the industry-standard scheduling methodology for construction. Unlike a simple bar chart or task list, a CPM schedule defines the logical relationships between activities — what must finish before something else can start, what can run in parallel, and which sequence of activities determines the project's minimum duration.
The result is a schedule that doesn't just show when things happen — it shows why they happen in that order, which activities have float (scheduling flexibility) and which don't, and exactly where a delay in one activity cascades into a delay to the entire project.
This makes CPM schedules the foundation for monthly progress reporting, delay claim analysis, recovery planning, and — increasingly — contractual requirements on projects over $1M.
From mobilization to closeout.
Every construction phase has unique scheduling considerations — predecessor dependencies, long-lead procurement, inspection holds, weather windows, and trade stacking constraints. We build schedules that account for all of them.
Enter your name and email — we'll follow up to discuss your scheduling needs. No spam, no list.
Questions about scheduling.
Let's build your schedule.
Tell us about your project and we'll scope a scheduling engagement — baseline development, ongoing updates, delay analysis, or all of the above.