Numbers that
survive closeout.
Schedules that
actually hold.
We deliver estimates, takeoffs, and CPM schedules for general contractors, developers, and owners — with documented assumptions, audited accuracy, and turnarounds measured in days, not weeks.
Three core deliverables.
One standard of work.
Each engagement ships with documented assumptions, source-of-truth files, and a walkthrough call. No surprises at closeout.
Detailed estimates from concept to GMP.
Quantity takeoffs across all CSI 16 & 50 divisions, normalized to current regional pricing. Every line item carries an assumption, a unit cost source, and a confidence flag. Issued as PDF, Excel, and your estimating software's native format.
- D.01Conceptual / ROM EstimatesClass 5 → Class 1
- D.02Schematic & DD Budgets±5–10% accuracy
- D.03GMP & Hard Bid Estimates±2–3% accuracy
- D.04Change Order Pricing & AuditsDocumented variance
- D.05Value Engineering StudiesItemized savings log
| Division | Qty | Amount |
|---|---|---|
| 03 — Concrete | 24,500 SF | $318,500 |
| 05 — Steel | 87 tons | $204,900 |
| 08 — Glazing | 142 units | $98,400 |
| 09 — Finishes | 18,200 SF | $76,200 |
| 15 — Mechanical | 1 LS | $142,000 |
| VE — Glazing alt. | — | −$38,400 |
| Total | $801,600 | |
CPM schedules built for the field, not the wall.
Baseline schedules with documented logic, resource loading, and float analysis. Two-week look-aheads, monthly updates, and delay/recovery analysis when projects slip. Delivered in Primavera P6, MS Project, or Smartsheet — your choice.
- D.06Baseline CPM SchedulesP6 / MSP / Smartsheet
- D.072-Week Look-AheadsWeekly issue cadence
- D.08Monthly Schedule UpdatesVariance & float report
- D.09Delay & Impact AnalysisTIA / Window methodology
- D.10Recovery SchedulesResource-leveled
End-to-end bid coordination.
From scope-of-work development through subcontractor leveling and award recommendations. We run the bid process so your team can run the project — invitation lists, RFI tracking, scope normalization, and award memos.
- D.11Scope of Work PackagesPer CSI 16 & 50 division
- D.12Subcontractor ProcurementInvitation & RFI mgmt
- D.13Bid Leveling MatrixApples-to-apples
- D.14Award RecommendationsMemo + supporting data
| Bidder | Base | Adj. | Final |
|---|---|---|---|
| Apex Finishes | $76,400 | +2,100 | $78,500 |
| Northpoint Drywall | $71,200 | +1,800 | $73,000 |
| Crestline Inc. | $79,900 | +3,400 | $83,300 |
| Summit Trades | $74,800 | +5,600 | $80,400 |
| Criteria | Buildwise | In-house team | Generic outsourcing |
|---|---|---|---|
| Turnaround | 5–14 days, fixed | 2–4 weeks, variable | 3–6 weeks, often slipped |
| Estimate accuracy | ±2.4% audited variance | Varies by estimator | Rarely tracked |
| Software stack | Bluebeam · P6 · Procore · Excel native | Whatever's licensed | PDF only, often |
| Fee structure | Fixed-fee, scoped up front | Fully loaded salary | Hourly, opaque |
| Revisions | Included until sign-off | N/A — internal | Per-revision charge |
| Documentation | Assumptions log + source-of-truth files | Tribal knowledge | Final PDF only |
| NDA & security | Standard, signed in 24 hrs | Built-in | Inconsistent |
Flat-rate residential estimates. From $99.
Building, renovating, or pricing a remodel? Get a detailed line-item estimate in 48 hours — fixed price, no commitment, revisions included.
From plans on day one to a deliverable on your desk in two weeks or less.
The questions buyers ask before signing.
Send us your plans. We'll send back a proposal in 24 hours.
Fixed-fee, scoped before you commit. Upload your plans or share a Drive/Dropbox link — we'll review and reply with scope, timeline, and price within one business day.